We were called in to do an end of season renovation. This included fraze mowing off surface, groundbreaking, using the Sandmaster to increase drainage. Next we applied 100 tonnes of Manfields sand which was dragged and matted into level. The ground was seeded using the Blec slit-seeder at 30mm spacings. Eight weeks later we vert-drained and Gwazaed to relieve deep compaction in the pitch.
After six weeks the pitch was healthy and coming along well.